Goal 1: Higher-Volume Operations at Non-towered/Non Radar
Airports
Began Design of High Volume Operations Terminal
Procedures.
Collinear approach for Dade-Collier (TNT).
2 Approach offset (15º & 4º) for Titusville
(TIX).
Began Procedural check flights at Titusville.
Goal 2: Lower Landing Minimums at Minimally Equipped Airports
Installed Goodrich SmartDeck displays
in Embry-Riddle SATS Cessna 310
Installed Avidyne displays in
Beech X-1
Goal 3: Increased Single-Pilot Crew Safety and Mission Reliability
Designed Single pilot performance Baseline Approach
Simulations
Conducted Crosswind Simulations
Conducted 200 Single pilot performance Baseline
Approach Simulations.
Single pilot performance Data Collection Flights
in progress at Daytona Beach International (DAB)
and Titusville (TIX).
Goal 4: Safe Integration of SATS Equipped Aircraft into
the National Airpsace System
Researchers modeled SATS traffic overlaid
on existing traffic at SATS Candidate Airports.
Progress toward the Southeast SATSLab Flight Test Bed
Established SATS Operational Command Center (SOCC)
and Real-Time ATC Lab on Embry-Riddle campus at Daytona
Beach International Airport.
Established ACTTs/ Mini-Ops Centers at Gainesville
Regional (GNV), Melbourne International (MLB), Sebring
Regional (SEF), Titusville (TIX), and Tamiami (TMB)
Established ADS-B Coverage to Test
Bed Airports and to 2000 AGL over most of Florida.